Geopolymer infrastructure

Validation
from bench to supply

We publish where each claim stands. Results are added here as independent tests are completed.

Testing program

Design targets, independently tested.

TestStandardWhat it showsStatus
Compressive strengthASTM C39 / C109Load-bearing capacity at 1, 7 and 28 daysPlanned
Fire enduranceUL 1709 / ASTM E119Performance under sustained high-heat exposurePlanned
Absorption & porosityASTM C642Water uptake, freeze-thaw and chloride resistancePlanned
Acid resistanceSulfuric acid immersionDurability in sewer and wastewater servicePlanned
Environmental Product DeclarationISO 14025 / LCAIndependently verified embodied carbonPlanned
Roadmap

A deliberate path to supply.

  1. 01
    Phase 1 · We are here

    Formulation & bench prototyping

    Optimize mixes from regional feedstocks; small-batch casting.

  2. 02
    Phase 2

    Laboratory testing

    Third-party mechanical, fire, durability and chemical testing.

  3. 03
    Phase 3

    Standards & approvals

    Material listings, code evaluation reports and EPDs required for public procurement.

  4. 04
    Phase 4

    Pilot production & field trials

    Production tooling, pilot runs and monitored field installations.

  5. 05
    Phase 5

    Commercial supply

    Supply agreements, QA/QC batch tracking and regional distribution.

  6. 06
    Phase 6

    Compliance & assurance

    Insurance, safety data sheets, warranties and supplier registration.

Interested in a pilot installation?

Discuss a pilot →